Notre Dame Academy

Paul Hemmer Company oversaw the completion of Notre Dame Academy’s largest-ever campus expansion, which includes a new performing arts center, new athletic facilities and renovations to existing facilities.  

The improvements and additions to the Notre Dame Academy campus included:

  • New Performing Arts Center:  8,450 sq. ft. performing arts center includes a 400-seat auditorium with an orchestra pit, a deep 80-foot-wide stage, shop for stage sets and props, a catwalk for theater lighting and technical effects, instrument storage, and a 2,500 sq. ft. lobby with art gallery and concession areas.

  • New Athletic Facilities: New athletic facilities include an 8-lane outdoor track; a synthetic turf field for soccer, field hockey and lacrosse and intramural sports; and relocation of tennis courts.

  • Renovations to Existing Facilities:  Renovations to the existing art and music facilities include a new band room, choral room, costume shop, art room and three acoustically prepared practice rooms.  The gymnasium received an annex with new locker rooms, and the strength training room was relocated. The gym was also air-conditioned. Science labs were expanded and language labs upgraded.  Technology improvements were also integrated throughout the classrooms.

Latest News

“An ounce of prevention is worth a pound of cure.”  Benjamin Franklin The greatest impact on any construction project is best realiz...

Read More >

A joint venture between CA Industrial and Diamond Realty Investments Inc. is developing its first industrial building in Greater Cincinnati. &nbs...

Read More >

Have you ever watched a sporting event where one team seemed like they could not do anything right?  Unfortunately, construction projects can exp...

Read More >

What our Clients Say

"Hemmer really stepped up to help us meet our store opening deadline despite some bad weather issues. They did a great job keeping us on track for a successful opening."
-- Dick Blandford, Ace Hardware
Read More