St. Elizabeth - Florence

Category: Health Care

Paul Hemmer Company worked with the hospital and developer in designing and constructing a three-story, 54,000 sq. ft. speculative medical building on the Florence, Kentucky campus of St. Luke Hospital (now St. Elizabeth).  Hemmer was selected over multiple contractors that competed for the project. The building was located on an existing campus, and was connected to the hospital through a pedestrian connector to enable patients to access the hospital for services immediately after visiting their doctor.  The project also included the reconfiguration of the hospital’s existing parking lots. The design-build team included Viox and Viox and KZF Design.

Latest News

Value Engineering is More than Lowering Cost

Read More >
Value engineering is more than lowering cost

The term “value engineering” is often used synonymously with “cost cutting”.  While that is partially true, the actual go...

Read More >

Hemmer Can Help with 2020 Budgeting

Read More >

What our Clients Say

"We are very pleased with the quality and service for the construction of our new surgery center."
-- Dr. Sherif Awadalla, Institute for Reproductive Health
Read More

Newsletter Subscription

Sign up for our electronic newsletter to receive e-mail updates.

Subscribe