Project Summary
Paul Hemmer Company completed the construction of a new manufacturing facility for Mubea in Florence, Kentucky. The project included the development of a modern industrial building designed to support manufacturing operations along with integrated administrative office space.
The facility was designed to provide efficient production floor space, support areas, and administrative functions within a single cohesive building. Construction focused on delivering durable industrial infrastructure while maintaining functional office environments for management and operational staff.
Key Features
- Large clear-span manufacturing floor designed for production flexibility
- Integrated office and administrative areas including conference and training rooms
- Dedicated employee support areas such as lunchroom and locker rooms
- Durable metal panel exterior system for long-term industrial performance
- Purpose-built manufacturing environment supporting operational efficiency

