IDI Logistics Park North Building 4

Owner

IDI Logistics

Location

Hebron, KY

Size

649,116 SF

Completion Date

2014

Project Delivery Method

Project Summary

Paul Hemmer Company delivered the construction of Park North Building 4, a large speculative industrial facility developed to support modern distribution and logistics operations in Northern Kentucky’s CVG industrial corridor. The building was designed as a flexible warehouse platform capable of accommodating high-volume shipping, storage, and light manufacturing users. The project incorporates a high-bay warehouse layout, extensive dock infrastructure, and durable precast construction systems to support long-term industrial use. Comprehensive site improvements, truck circulation areas, and building infrastructure were included to support efficient freight movement and scalable tenant operations. The completed facility provides a highly adaptable industrial asset positioned to serve growing logistics demand in the region.

Key Features

  • High-bay warehouse configuration with clear heights suitable for modern racking systems
  • Load-bearing insulated precast concrete wall panels for durability and energy performance
  • Extensive dock door infrastructure supporting high-volume loading operations
  • Drive-in doors providing additional warehouse access and operational flexibility
  • ESFR fire protection system designed for high-piled storage environments
  • Structural steel framing system providing large open-span interior bays

Project Photos

Project Videos

Scroll to Top