Keller Warehousing and Packaging

Owner

Keller Logistics

Location

Latonia, KY

Size

198,759 SF

Completion Date

2023

Project Delivery Method

Project Summary

Paul Hemmer Company completed renovations and interior improvements to the Keller Logistics facility in Covington, Kentucky to support expanded repacking and warehouse operations. The project focused on transforming existing retail space within the building into functional logistics and office space while improving building infrastructure and operational efficiency. Work included demolition of an existing 40,000-square-foot mezzanine, removal of interior finishes, and preparation of the warehouse floor to accommodate new operational layouts. A new office suite was constructed within the facility, including breakrooms, conference areas, restrooms, and support spaces designed to support Keller’s warehouse and logistics team. Mechanical, electrical, plumbing, and fire protection systems were upgraded to support the new office build-out and warehouse operations. Improvements included new rooftop HVAC units, LED lighting upgrades, updated sprinkler coverage, and new storefront entry systems.

Key Features

  • Warehouse Reconfiguration: Demolition and removal of a 40,000 SF mezzanine and associated mechanical, electrical, and fire protection systems to open warehouse space for logistics operations.
  • Office Build-Out: Construction of a new interior office suite including conference rooms, breakrooms, restrooms, and administrative workspaces with metal stud framing and drywall partitions.
  • Mechanical Upgrades: Installation of new rooftop HVAC equipment including 5-ton and 10-ton RTUs, exhaust systems, and PTAC units to support the renovated office areas.
  • Lighting Improvements: Installation of new LED lighting throughout office and warehouse areas, including high-bay fixtures with motion sensors to improve energy efficiency.
  • Fire Protection Modifications: Engineering review and updates to the sprinkler system, including installation of 81 new sprinklers in remodeled areas to maintain code-compliant coverage.
  • Interior Finishes: Installation of LVT flooring, ceramic tile restrooms, acoustical ceilings, and new millwork including cabinetry in breakroom and conference spaces.
  • Exterior Improvements: Design studies evaluated façade updates, site circulation, and future outlot development opportunities for the facility.