NorthPoint | Union Center Logistics Park 1 & 2

Owner

NorthPoint Development

Location

Fairfield, OH

Size

604,000 SF

Completion Date

2017

Project Delivery Method

Project Summary

Paul Hemmer Company delivered the Seward at Union Center warehouse development in Fairfield, Ohio, for NorthPoint Development. The project included demolition of existing site elements and full ground-up construction of two speculative industrial warehouse buildings designed to support high-volume logistics and distribution users. Significant site coordination was required, including wetland mitigation, utility infrastructure, and heavy-duty paving systems. The result is a modern industrial development engineered for long-term durability, operational efficiency, and flexible tenant occupancy

Key Features

  • Speculative Industrial Development: Two ground-up warehouse facilities designed for flexible distribution and logistics tenants.
  • Comprehensive Site Preparation: Full demolition of existing foundations and improvements, wetland mitigation, environmental coordination, and NPDES permitting compliance
  • Heavy-Duty Pavement Systems: Engineered asphalt sections with high-capacity stone bases and reinforced dolly pad areas to support truck circulation and dock operations.
  • Dock & Drive-In Access: Sloped concrete drive-in ramps integrated into dock areas for improved durability and operational flow.
  • Robust Utility Infrastructure: Separate domestic water, fire service, and sanitary sewer systems for each building, coordinated to meet fire protection and operational requirements.
  • Fire Protection Coordination: Fire lines sized and looped as required to support building sprinkler systems and code compliance.
  • Site Retaining & Civil Improvements: Design-build retaining wall solutions incorporated as required to support grading and site conditions.

Project Photos

Project Videos

Scroll to Top